Each course [duration, lastDay]. Take max number of courses (one at a time). Each must finish by lastDay.

Example 1 — courses=[[100,200],[200,1300],[1000,1250],[2000,3200]] → 3Example 2 — courses=[[1,2]] → 1Example 3 — courses=[[3,2],[4,3]] → 0 (each course exceeds its own deadline before others start)

Constraints — 1 ≤ n ≤ 10⁴. Brute enumeration of subsets is 2ⁿ = 10³⁰⁰⁰ — impossible. Greedy is O(n log n). Brute enumerates 2ⁿ course subsets — 10⁹⁰³⁰ dies at n=10⁴. Sort by deadline + max-heap of chosen durations (swap when over) is O(n log n) = ~10⁶ ops.

Progressive Hints
Try to solve it yourself first. Reveal hints only when stuck — each hint is progressively more specific.
---
⏱️Interview timer00:00
Practice under interview pressure. Start when you begin reading; stop when you finish. Save best only when you had a full working solution.
Target for interview: Medium = 20-25 min · Hard = 30-40 min · Best time persists on this device only.

Approach 1 — Brute force subset enumeration ​

Intuition. For each subset of courses, sort by deadline, simulate, check feasibility, track the largest feasible subset size.

java
int scheduleCourseBrute(int[][] courses) {
    int n = courses.length, best = 0;
    for (int mask = 0; mask < (1 << n); mask++) {
        List<int[]> sub = new ArrayList<>();
        for (int i = 0; i < n; i++) if ((mask & (1 << i)) != 0) sub.add(courses[i]);
        sub.sort((a, b) -> a[1] - b[1]);
        int time = 0; boolean ok = true;
        for (int[] c : sub) {
            time += c[0];
            if (time > c[1]) { ok = false; break; }
        }
        if (ok) best = Math.max(best, sub.size());
    }
    return best;
}

Complexity — Time O(2ⁿ · n log n); Space O(n). Dies past n=20. In an interview state this then flip to regret-heap greedy.


Approach 2 — Sort by deadline + max-heap regret (canonical) ​

Insight. Sort by deadline ascending. Iterate; always tentatively take the course; push its duration into a max-heap. If total time now exceeds the current deadline, swap out the largest-duration course we've already taken.

Why greedy works — exchange argument. After sorting by deadline, suppose optimal takes courses S. If greedy would drop the largest-duration course to keep feasibility, it can never be worse than dropping any other, because the largest one being replaced by a smaller-or-equal is a straight improvement to total time budget.

java
int scheduleCourse(int[][] courses) {
    Arrays.sort(courses, (a, b) -> a[1] - b[1]);
    PriorityQueue<Integer> pq = new PriorityQueue<>(Comparator.reverseOrder());
    int time = 0;
    for (int[] c : courses) {
        time += c[0]; pq.offer(c[0]);
        if (time > c[1]) time -= pq.poll();
    }
    return pq.size();
}
Execution Trace
Sort by deadline + max-heap regret (canonical)
i10002001phase = start
Step 1 / 3Initialize scan.

Complexity — Time O(n log n); Space O(n). Say aloud in an interview: "regret-heap greedy — take everything speculatively, then evict the worst if constraints break. Also appears in IPO, Task Scheduler, Meeting Rooms II."


Try it yourself ​

Complexity summary ​

ApproachTimeSpaceGrade
Subset brute forceO(2ⁿ · n log n)O(n)Reference; TLE past n=20
Sort + regret heapO(n log n)O(n)Canonical

When to use which ​

  • "Max count with deadlines and swap-out" → regret heap.
  • "Max value" → weighted variant → DP or different greedy.